intu Victoria Centre Nottingham
Location: Nottingham

There were three parts to our Electrical Package on the intu Victoria Centre back of House Electrical and Mechanical upgrade keeping us on site over 8 months
A new plant room was constructed for the new Ground Source Cooling System and Pump Housings at either end of the Victoria Centre for the Abstraction Pumps.
A metering system was installed to monitor the water usage to the shops and on top of Victoria House the Chillers were replaced.